• Project Name

    Fabrication and installation of the steel structure for the Green Student Dormitory project at Tarbiat Modares University

  • Main volumes

    1. Fabrication, transportation, and installation of bolted steel structure: 1800 tons
    2. Installation using the top-down method
  • Year of execution

    Start date: October 2020

    Project status: Contract termination due to lack of project liquidity

    Progress percentage: 12%